Appendices

Riverfront Redevelopment DEIS Appendices
Appendix
Description
Appendix A (PDF)
Snohomish Riverfront Properties at Bigelow Creek: Conceptual Restoration Program
Appendix B (PDF)
Preliminary Geotechnical Engineering Services Report, Everett Redevelopment Project - Simpson Pad
Appendix C (PDF)
Revised Flood Hazard Analysis, Channel Migration Potential, and Slope Stability Evaluation Report
Appendix D (PDF)
Biological Assessment and Habitat Management Plan
Appendix E (PDF)
Wetlands and Stream Compilation and Review
Appendix F (PDF)
Ordinary High Water Mark Delineation Letter Report
Appendix G (PDF)
Everett Riverfront Master Plan Mixed-Use Development Design Guidelines
Appendix H (PDF)
Transportation Impacts Report
Appendix I (PDF)
Rezone Application and Shoreline Permit Application
 
Appendix J
Cultural Resources Assessment for the Everett Riverfront Master Plan and Redevelopment (confidential information not available for general public review)
 
Appendix K (PDF)
Everett Riverfront Development EIS, EIS Drainage Report Calculations