Wetmore Ave Stormwater Bypass

Purpose

Mitigate future property damage due to intense rainfall experienced historically in the 3500 block of Wetmore Avenue. 

Project Description

The City will construct a 2-block stormwater bypass and drainage improvements that will accommodate higher capacity stormwater flows. A 30-inch storm drainage pipe will installed between Wetmore and Oakes on 35th Street, south of downtown Everett.

City crews will also replace and upsize approximately 285 feet of sewer main in the alley between Wetmore and Rockefeller, south of 35th, after the 30-inch bypass pipe installation is completed by the City's contractor (Interwest Construction). This work will include reconnecting side sewers to the new main.

Timeline

Start construction: September 10, 2018
Complete construction: late October 2018

Project Manager

Amie Roshak, PE
425-257-7249

Construction Manager

Keith Alewine
425-257-7225